泰安工地電梯門套的工程量怎么計算
電梯門套工程量的計算需根據材料類型和安裝方式分別處理,具體規則如下:
The calculation of the quantity of elevator door frame engineering needs to be handled separately according to the material type and installation method. The specific rules are as follows:
一、按材料類型計算
1、 Calculated by material type
不銹鋼門套
stainless steel door frame
計算規則 :按門套長度計算,采用設計寬度匹配定額子目。若材料變更(如從1mm鏡面改為2mm拉絲不銹鋼),僅調整不銹鋼單價,其他項目不變。
Calculation rule: Calculated based on the length of the door frame, using the design width to match the quota sub item. If the material changes (such as changing from 1mm mirror to 2mm brushed stainless steel), only the stainless steel unit price will be adjusted, and other items will remain unchanged.
示例 :若門套長度為2100mm,設計寬度為1000mm,則工程量=2100×1000=2,100,000mm?。
Example: If the length of the door frame is 2100mm and the design width is 1000mm, then the engineering quantity is 2100 × 1000=210000mm?.
石材門套
Stone door frame
計算規則 :按裝飾線條長度計算(若為干掛大理石),或按門套展開面積計算(如異形門套)。需結合立面圖和施工細節確定。
Calculation rules: Calculated based on the length of decorative lines (if it is dry hanging marble), or based on the unfolded area of door frames (such as irregular door frames). It needs to be determined based on the elevation drawing and construction details.
示例 :若石材線條長度為345.6m,則工程量=345.6m。
Example: If the length of the stone line is 345.6m, then the quantity of work is 345.6m.
二、按安裝方式計算
2、 Calculated by installation method
成品門套
Finished door frame
直接按門套長度計算,采用定額子目。
Calculate directly based on the length of the door frame, using quota sub items.
木筋包飾面門套
Wooden tendon wrapped decorative door frame
按飾面面積計算,需結合門洞尺寸和裝飾工藝。
Calculated based on the surface area, it is necessary to consider the size of the door opening and the decoration process.
三、注意事項
3、 Precautions
尺寸調整 :門套寬度需略大于門洞寬度,確保無障礙通行。
Size adjustment: The width of the door frame should be slightly larger than the width of the door opening to ensure unobstructed passage.
變更管理 :材料或工藝變更需及時調整工程量計算規則。
Change management: Material or process changes require timely adjustment of the calculation rules for engineering quantities.
計價依據 :具體計算方法需參照《建設工程計量標準》及企業定額。
Pricing basis: The specific calculation method should refer to the "Measurement Standards for Construction Projects" and the enterprise quota.
通過以上規則,可準確計算電梯門套的工程量,確保施工與結算的準確性。
By following the above rules, the quantity of elevator door frames can be accurately calculated to ensure the accuracy of construction and settlement.
本文由 泰安工地電梯門套 友情奉獻.更多有關的知識請點擊 http://m.zzhzbsx.com/ 真誠的態度.為您提供為全面的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.
This article is a friendly contribution from the elevator door frame of Tai'an construction site For more related knowledge, please click http://m.zzhzbsx.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.